🔗 The M2W platform connects overseas and Vietnamese schools →🔗 Connect international and Vietnamese schools → 🎓 International recruitment — overseas schools, join now →🎓 International recruitment for schools → 🤝 School-to-school cooperation: student & teacher exchange, summer camps →🤝 School cooperation & joint programs → 🏫 Vietnamese schools — international cooperation, summer camps, joint programs →🏫 Vietnamese schools go international →

Point of Contact Between Two Parties: Why a School Should Designate One Person

July 9, 2026 17 min read By My Second World
Point of Contact Between Two Parties: Why a School Should Designate One Person

The point of contact is the smallest detail in a partnership agreement, and also the most decisive one. Most partnerships do not die from disagreement but from silence, and silence almost always stems from it being unclear who is responsible for replying.

This article explains why a single point of contact is needed, who should fill that role, and how to manage the biggest risk that comes with it.

What Happens When There Is No Clear Point of Contact

Three situations that recur at many schools.

An email sent to a shared inbox that no one replies to. Everyone who reads it assumes someone else will handle it. After two weeks, the partner concludes that the school is not interested.

Each contact reaches a different person. The partner has to explain the context from scratch every time, and they will gradually reduce how often they reach out.

Two people reply with different content. This situation causes the most damage, as it leaves the partner not knowing whom to trust and questioning the professionalism of the whole organization.

What the three situations have in common: none of them creates conflict, they just let the relationship cool off. And because there is no clear-cut event, no one realizes the relationship has died until they look back years later.

Why One Person Instead of One Department

Some argue that assigning this to a department is safer than assigning it to one individual. In practice, it is the opposite.

Distributed responsibility is responsibility that does not exist. When an entire department is responsible for replying, in practice no one sees it as their own job.

Relationships are built between people. A partner remembers one person’s name, knows how they work, and builds trust based on past exchanges. This does not happen with a shared inbox.

Consistency. One person who holds the entire exchange history will reply far more consistently than multiple people each answering their own way.

Speed. Someone who already knows the context replies faster than someone who has to look everything up from scratch.

This does not conflict with using a shared inbox. The right approach is for all correspondence to go through the school’s shared address, but with one specific person responsible for handling it and signing off.

Choosing Who Serves as the Point of Contact

Four criteria, ranked by importance.

Having real time available. This is the most important criterion and the one most often overlooked. A capable person who is already overloaded will reply slowly, and slowness is a far bigger problem than an imperfect reply.

Time devoted to this role must be part of the person’s official workload, not extra work on the side.

Being able to work in the shared language. At the level of professional correspondence, not just conversational level.

Having the authority to respond within an agreed scope. If every question has to be escalated for approval, response time will stretch out to the point of losing all meaning.

Being disciplined about record-keeping. This role generates a lot of correspondence, and its value is retained only if it is recorded systematically.

One point worth noting: job title is not among the four criteria. A staff member with available time and clear authority does this role better than a busy senior leader.

Distinguishing the Point of Contact from the Decision-Maker

This is a point that is often confused and needs to be clarified in the agreement.

Point of contact handles day-to-day correspondence, tracks progress, and coordinates work between the two parties.

Decision-maker approves resources, signs documents, and decides on matters that go beyond the agreed scope.

Academic representative handles discussions on academic content.

These three roles can be held by one person at a small school, but they must be clearly stated in the agreement so the partner knows who to contact for what.

A common mistake is listing only the decision-maker’s name in the agreement. The result is that all day-to-day correspondence goes to someone too busy to reply, and the relationship cools even though both sides are acting in good faith.

The Biggest Risk: The Point of Contact Leaves

This is the most likely risk in the entire international partnership operation, and also the most underrated one.

When an entire relationship exists only in one person’s head and personal inbox, that person changing jobs wipes out years of relationship-building.

Four preventive measures, all of them simple.

A shared mailbox. All correspondence goes through an address on the school’s own domain, not through a personal account. This is the most important measure and the least effort to put in place.

A shared record repository. Agreements, meeting minutes, the partner list, and the status of each relationship, all kept in one place that several people can access.

A second person who knows the context. They do not need to work on it jointly, just to know what stage the relationship is at and where the records are kept.

Notes taken after every important exchange. A short paragraph is enough.

Together these four measures take very little time but shift the risk from severe down to manageable.

Handover When the Contact Changes

When the point of contact changes, there are three things to do, and the third is the one most often skipped.

Handing over the records. The partner list, the status of each relationship, and ongoing work items with their timelines.

Transferring access rights. The shared inbox, the records storage, and related systems.

Introducing the new contact to the partner’s point of contact. A short email from the outgoing contact introducing the new one preserves the relationship. Changing staff silently causes the partner to lose contact, and they rarely reach out to ask on their own.

This third step takes five minutes and determines whether the relationship continues. Many partnerships die at exactly this moment, not because anyone did something wrong but because no one thought to give notice.

If the outgoing contact has already left without making the introduction, the new contact should proactively send an introductory email, stating clearly who they took over from and since when.

The Corresponding Requirement for the Partner Side

The agreement should require both sides to designate a point of contact, not just one.

Three items should be written into the document.

The name and title of each side’s point of contact, along with an email address on the organization’s own domain.

The obligation to give notice of any change. Within a specified period, and including the replacement’s information.

Expected response time. This need not be a hard commitment, but there should be a shared benchmark so both sides have the same expectations.

The third item resolves a common misunderstanding: the two sides work at different paces, and a side used to replying within a day will see a side used to replying within a week as unprofessional, even though neither side is wrong.

When context is needed on how the partner’s education system organizes its work, the comparative data from the Organisation for Economic Co-operation and Development (OECD) provides a general reference.

When One Side Has No Active Point of Contact

This situation is fairly common and needs to be addressed rather than left to cool off.

Warning signs. Emails sent get no reply for weeks. The email address bounces. Or there is a reply, but the person answering clearly does not know the context.

How to handle it. First, try reaching out through another channel: the school-level international cooperation office, or the relevant academic department. In many cases it is simply that the previous contact has moved on and no one was handed the responsibility.

If there is still no result after two attempts, the relationship should be treated as dormant and placed on the review list at the next renewal period.

What should not be done is continuing to list that relationship as active. A list that does not reflect reality leads to wrong decisions about resource allocation.

Maintaining Contact When There Is Nothing to Discuss

A partnership usually goes through periods with no activity at all. If both sides stay completely silent during those periods, the relationship will cool off.

Three low-effort ways to maintain it.

Periodic emails. Twice a year, brief, to give an update and check in. There is no need to have new business to discuss.

Sharing useful information. An article relevant to a field both sides are interested in, information about a scholarship, or an upcoming event.

Occasion-based greetings. The partner country’s holidays, or when they achieve something noteworthy.

Together these three things take less than two hours a year but keep the relationship alive, so when a new partnership opportunity arises there is no need to start from scratch.

For content related to recognition of learning outcomes that the two points of contact often need to discuss, the framework of The United Nations Educational, Scientific and Cultural Organization (UNESCO) is a shared reference document both sides should be familiar with.

A good report needs to distinguish between results already achieved, work in progress, and risks that require a decision from the school board.

Summary

The point of contact is a small detail in the agreement but determines whether the partnership lives or dies, since most partnerships do not die from disagreement but from silence.

A specific person should be designated instead of a department, and the most important selection criterion is not job title or expertise but having real time counted into their workload.

And the biggest risk is that person leaving, which is managed with four simple measures, the most important being that all correspondence goes through the school’s shared inbox.

Next Steps

Check your school’s existing partnership agreements and answer one question for each: is the person named as the point of contact still working at the school, and do they know they are holding that role.

The second question often produces a surprising result, since many assignments exist only on paper and the assigned person was never informed.

If you find an agreement whose point of contact has left the school, the immediate task is to designate a replacement and send an introductory email to the partner. Many relationships that seem dead are, in fact, only waiting for such an email to be revived.

This is also a good opportunity to review the entire list and clearly separate two groups: relationships that are genuinely active and relationships that exist only on paper.

Related articles

Need advice on the right immigration pathway?

Leave your details and an M2W specialist will contact you for a free consultation within 24 working hours.

Join the platform